Adaptation and modernization of the railyard area at Juan Carlos I Industrial park to ensure the fully connectivity with the Mediterranean Corridor.
Reconditioning of access to dual gauge, adaptation to UIC/Dual/Iberian gauge including switches, drainage, electrification, signalling, and complementary works.
Initial studies so as to find the right alternative across 118,000 sqm of rail yard ‘s area.
Topographical survey : More than 5,000 points. Line measurement: 13 km.
Many different elements have been considered: