New Battery Building
Expansion of building 71, to accommodate assembly process
Development of the work
The building 71 is extended to the west by 950 m², having to demolish the existing buildings, known as building 65.
The building is equipped with a new air-conditioning system to guarantee optimal humidity and temperature conditions for the processes.
The eastern part of the building becomes a logistics area where the assembled batteries are sent to the factory’s production lines, with a 450 m² canopy to the south.
An important part of the project was the relocation of the Estate Maintenance Department, which was the user of the building, along several factory buildings (buildings 15, 17 and 48).
The development of the project was carried out following the BIM methodology, working on a 3D model of the building.