2003-017-DO Terminal de contenedores

Interoperability: key to energy sustainability Sectors Transportation Engineering Services Development of the work Creation of a container terminal for use of the Industrial Area in Almussafes (Valencia), which allows the classification and container stacking, enabling the interoperability of containers between rail and road transport. A logistic study was carried out for the optimization of work […]

2013_161_R0_Mafelec_Ampliación del túnel sobre nave de montaje

Flying I go, flying I come Sectors Building & Architecture Services Development of the work In Ford’s Factory in Almussafes, the EXTENSION OF THE CARRIERS TUNNEL ON THE ASSEMBLY SHOP has been carried out. These works are located between the bays S5 and U6. The works carried out by ARIN consisted of: Design of a […]

2017-224A-F_Ford_PTO_Extensión de marquesina

Create a Canopy of 3,000 square meters Sectors Building & Architecture Services Development of the work Project and construction management of a 3000 sqm canopy and all surrounding areas Ford Almussafes Factory. Preliminary engineering work: solutions study plus corresponding cost estimates, detailed cost estimation of the final solution, topographic survey, geotechnical study and project to […]

2006-1900-059-Regulación excedentes río Belcaire

A 2 million m3 pond to recharge the aquifers Sectors Environmental Engineering Services Development of the work The water work contemplates the execution of a regulation pond with a capacity of two cubic hectometres. The works had an execution period of 17 months and allows the use of some two cubic hectometers of water per […]

2006-017-DO Ampliación Real club Náutico de Valencia

236 moorings for vessels between 20 and 120m Sectors Transportation Engineering Services Development of the work Project and Management of the extension works of the Royal Nautical Club of Valencia to house the base of mega-yachts in Valencia, consisting of the shelter works for the extension of the marina by means of a gravity pier […]