2020-147

Improved safety and operation Sectors Transportation Engineering Services Development of the work Improvements to the rail and road network, including a new track bed, elimination of level crossings and reorganisation of the road network between the Muelle de Poniente and Muelle de Costa of the Port of Valencia, as part of the Connecting Europe Facility […]

1998-012_zonadeportivamarinadenia

Design and construction of a marina with more than 400 berths Sectors Transportation Engineering Services Development of the work Design, technical assistance and construction management of a marina with 409 berths for vessels between 7’00 and 50’00 m, including a car park for 461 vehicles and services necessary for the proper development of the complex, […]

2021-153_depositotormentascalleibiza

BIM Construction Project of a 26,000 m3 capacity Storm Tank Sectors Environmental Engineering Services Development of the work Anti DSU storm tank with a budget of 14.8 million euros and an execution period of 29 months. The work is located in the city of Valencia, in section XVI of the Turia Gardens, on the left […]

2021-154_depositotormentasalameda

BIM Construction Project of a 40,000 m3 capacity Storm Tank Sectors Environmental Engineering Services Development of the work Storm tank with anti-DSU function of 39,270 m3, which includes the connection via a bypass collector from the northern transit collector to the 1-2-3 collector, the construction of a new northern waste collector, a large connection chamber […]

2021-107_obrasemergenciapuertocalpe

Avoiding the collapse of the structural capacity of the dyke Sectors Transportation Engineering Services Development of the work The coastal phenomena caused by the storms of November 2021 caused significant damage to the Port of Calpe, specifically to the eastern breakwater. The structural damage to the breakwater occurred in the same area that was also […]

2019-164_GranelesLiquidosPortCastelló

Gaining efficiency in supply operations Sectors Transportation Engineering Services Development of the work The works required for the construction of the new berth are mainly the dredging for the execution of the sidewalk, the caissons that make up the pier, the mooring dock, the superstructure and backfill, as well as the connecting mound and the […]

1996-025-Puente en Torrent

Improves the connection between Torrent and Mas del Jutge Sectors Transportation Engineering Services Development of the work In response to the need to solve the problem of heavy traffic which, in order to travel between the VV-3019 (road to Mas del Jutge) and the VP-3067 (road to Montroy), needs to enter the town centre of […]

2012-1900-343-Edificio almacenamiento carrocerías Ford

Automated storage of painted bodies Sectors Building & Architecture Services Development of the work Adaptation of the painted bodies storage building to hold longer models in Ford’s Factory in Almussafes, Valencia. Development of a basic project to obtain the construction permit, a full constructive project, construction management and the technical assistance during construction for the […]

2012-102_BodyShopExtension Ampliación Nave de Carrocerías Ford

Building of 85 000 sqm and adjacent areas Sectors Building & Architecture Services Development of the work New Body Shop building with an extension of 85.000 sqm and all the surrounding areas in Ford’s factory in Almussafes, Valencia. The works carried out by ARIN consisted in: The development of all the previous engineering works: land […]

2009-IND-2009-011-_Estacion AVE-JoaquinSorolla

Checking sound insulation Sectors Industrial Engineering Services Development of the work During the construction of the provisional AVE station in Valencia (Estación Valencia Joaquín Sorolla – Alta Velocidad) at the request of the construction company, Aldesa Construcciones, S.A., acoustic tests were carried out on offices and commercial premises to check the insulation of the enclosures […]