2017-262A_LUD_Reforma Banquillos Estadio Ciutat de Valencia
With optimal visibility from any perspective Sectors Building & Architecture Services Development of the work Renovation consisted of: Demolition and removal of obsolete benches Ground leveling in accordance to football pitch. Construction of reinforced concrete wall and stairs. Pitch drainage design. Glass and steel cover. Architecture, panoptics and optimal visibility studies from bench itself, new […]
2002-013-DO Poligono Industrial Juan Carlos I Almussafes
First Industrial Park in Spain with «Just in Time» concept Sectors Ciudades Services Development of the work It turned out to be the first Industrial Park with the «Just in Time» concept, in order to optimize the stocks and assemblies that reach the customer at the time of use. With almost 700,000 m2, a new […]
2001-021-Urbanizacion Sector 14 Toll L’Alberca
It runs along the CV-405 road Sectors Ciudades Services Development of the work The object of this urbanization project of Sector 14 «El Toll – L’Alberca» is the planning, description and design of the works necessary for the construction of the mentioned urbanization. To be able to start the works, the present project has been […]
2017-224-Ford_Nuevo colector contraincendios edif. PTO
How to extinguish a fire with 260 litres per second Sectors Industrial Engineering Services Development of the work Due to the construction of the new PTO building, the connection pipes to the S-24C 171 O-INT collector in building 171 and to the control stations 171/O-15 and 171/O-16, also in building 171, which ran underground in […]
2018-246_Torres refrigeración edificio 181 Ford
New chillers for the Body 2 Plant Sectors Industrial Engineering Services Development of the work Part of the cold air production for the air conditioning of the Body 2 Plant was generated in the technical room 181 by water-condensed chillers with more than 40 years of operation. The production lines in this Body Plant are […]
2002-036-Colectores generales de Alboraya
Integral sanitation of the population of Alboraya Sectors Environmental Engineering Services Development of the work The project consists of calculating and defining the sanitation facilities needed to complete the network of traps in the town of Alboraya. The collector networks have been divided into several sectors, each with a main trap in which other secondary […]
2002-043_EDAR Fuente del Jarro
Flow (m3/day): 14,000 Population served (h): 102,280 Sectors Environmental Engineering Services Development of the work Technical assistance for the southern collector of La Cañada; Fuente del Jarro wastewater treatment plant industrial estate and Paterna wastewater treatment plant (Valencia). The Paterna I wastewater treatment plant was put into operation in 1972 with a daily flow of […]
2010-1900-266-AT Obras de laminación rambla Gallinera
A region threatened by frequent torrential rains Sectors Environmental Engineering Services Development of the work Technical Assistance to the Site Management included in the urgent action 3.3.d., «Construction project of the works of lamination and improvement of the drainage of the Rambla Gallinera Basin (Valencia and Alicante)». Customer : Acuamed Budget : 40.900.000,00 € The […]
2009-1900-169-SNCZI Sistema Nacional Cartografía Zonas Inundables
River Space Management Support Tool Sectors Enviromental Engineering Services Development of the work The Ministry of the Environment and Rural and Marine Affairs, following the principles of Directive 2007/60 on the assessment and management of flood risks, launched the National System of Flood Area Mapping (SNCZI), a tool to support river area management, risk prevention, […]
2007-1900-072-Ampliación Puerto de Cullera
Extension of the fishing area and the sports area Sectors Transportation Engineering Services Development of the work Development of the project for the extension of the port of Cullera. (Valencia). The surface area for the new port facilities is 179,059 m², and is intended for a fishing area and a sports area. In the Fishing […]